South East · District

Elmbridge

Elmbridge approved 76.9% of the applications it decided, 10.1% below the England average.

Approved

76.9%

England 87%

Decided on time

91.3%

Inside the statutory period

Applications a year

1,541

Decided in the reporting year

See it on the mapAll authorities

Against the country

Harder than the average.

The England benchmark is 87%. It is the share of decided applications that were approved, so a withdrawal counts as neither. Source: MHCLG Live Table P120A (England, rolling 12-month).

What we hold, and what we do not

Elmbridge

76.9%

England

87%

Standard-method local housing need: 653 dwellings a year.

The rules here

What this authority decides against.

An application is judged against the adopted development plan unless material considerations say otherwise. This is that plan, and the levy that comes with it.

Local planCore Strategy
Adopted2011-07-20
Community Infrastructure LevyCharging schedule adopted

Read the adopted plan

Ask this council

A question about Elmbridge, answered from its own record.

Ask Wren about Elmbridge

0 credits · 1 credit / question

Every answer is grounded in Wren's data for this council and links the source it draws on.

Wren reads the plan, the policies and the charging schedule on this page and answers from those. Every answer links the source it drew on, so you can check it against the council’s own document.

What Wren does here

23.1% of applications here are refused.

Elmbridge decided 1,541 applications in the reporting year, and refused about 23.1% of them. A refusal is usually a document problem rather than a scheme problem: the policy that governs it was not addressed, or the evidence it asks for was not there.

Wren drafts against Core Strategy, a chartered planner reads the draft and signs it under their own indemnity, and a case manager files it and chases it. A householder application is £499, and Elmbridge's own statutory fee is separate and paid by you directly to them.

Draw your site hereWhat it costs