London · London Borough

Tower Hamlets

Tower Hamlets approved 83.6% of the applications it decided, 3.4% below the England average.

Approved

83.6%

England 87%

Decided on time

92.7%

Inside the statutory period

Applications a year

1,047

Decided in the reporting year

See it on the mapAll authorities

Against the country

Harder than the average.

The England benchmark is 87%. It is the share of decided applications that were approved, so a withdrawal counts as neither. Source: MHCLG Live Table P120A (England, rolling 12-month).

What we hold, and what we do not

Tower Hamlets

83.6%

England

87%

Standard-method local housing need: 5,190 dwellings a year.

Ask this council

A question about Tower Hamlets, answered from its own record.

Ask Wren about Tower Hamlets

0 credits · 1 credit / question

Every answer is grounded in Wren's data for this council and links the source it draws on.

Wren reads the plan, the policies and the charging schedule on this page and answers from those. Every answer links the source it drew on, so you can check it against the council’s own document.

What Wren does here

16.4% of applications here are refused.

Tower Hamlets decided 1,047 applications in the reporting year, and refused about 16.4% of them. A refusal is usually a document problem rather than a scheme problem: the policy that governs it was not addressed, or the evidence it asks for was not there.

Wren drafts against this authority's own plan, a chartered planner reads the draft and signs it under their own indemnity, and a case manager files it and chases it. A householder application is £499, and Tower Hamlets's own statutory fee is separate and paid by you directly to them.

Draw your site hereWhat it costs