Document
Tree Works
Supports an application to work on trees protected by a Tree Preservation Order, or a notification of work in a conservation area.
- The tier this usually sits in
- Single-document routeThe tier this usually sits in
- Wren, for a case at that tier
- £499Wren, for a case at that tier
- Specimen you can read in full
- PublishedSpecimen you can read in full
- Sections inside it
- 4Sections inside it

What is inside
Section by section.
- 01The trees affected and their protection status
- 02The works proposed and the arboricultural reasoning
- 03The condition of each tree and any safety case
- 04Replacement planting where it is expected
When it is required
Why a council asks for this.
Sections 197 to 214 of the Town and Country Planning Act 1990, and section 211 for conservation-area notifications.
This is a supporting statement only. The statutory tree works application form, and the tree-by-tree schedule of works that normally accompanies it, must be filed separately through the Planning Portal. Complex cases usually also need a BS 5837 survey from an arboriculturist. You are told this in the quote step, before you pay.
| Required when |
|---|
| The tree carries a Tree Preservation Order |
| The tree stands in a conservation area, where six weeks' notice is required |

Why it exists
Documents answer constraints.
A council does not ask for this because it likes paperwork. It asks because something on or near your site triggers it, and the appraisal will tell you whether yours is triggered before you pay for anything.
Asked and answered
About the Tree Works.
Why does Wren not produce the whole tree works application?
Often alongside
Documents that usually travel with it.
Proves that something you have built, or intend to build, is lawful and needs no planning permission. It is a certificate of fact, not a judgement of merit.
For development that is already permitted in principle, but where the council still gets a say on specific matters. Larger extensions and office-to-residential conversions are the common ones.
Submitted after permission is granted, to satisfy the conditions attached to it. Most permissions cannot be built out until these are cleared.
Changes something small on a permission you already hold, without going back for a new one. The test is whether the change is material, and that test is stricter than most people expect.
Find out whether your site needs one.
The appraisal names the route, lists the documents that route requires, and prices the set before you commit to anything.