Document

Sustainable Design Statement

Shows how a scheme answers your council's sustainability and climate policies. Several councils require one for anything that creates new floorspace, with no lower threshold.

The tier this usually sits in
MinorThe tier this usually sits in
Wren, for a case at that tier
£1,995Wren, for a case at that tier
Specimen you can read in full
PublishedSpecimen you can read in full
Sections inside it
6Sections inside it
A page from the Sustainable Design Statement specimen.
Sustainable Design Statement. A page from the real specimen. Watermarked throughout, because a specimen must never be mistakable for a signed submission.

What is inside

Section by section.

  1. 01The new floorspace created, which is what engages the requirement
  2. 02The council's adopted sustainability and climate policies, quoted from the adopted text
  3. 03Energy: reducing demand, supplying efficiently, then using renewables, and how the scheme answers each step
  4. 04Water efficiency
  5. 05Materials and embodied carbon
  6. 06Overheating and climate resilience

When it is required

Why a council asks for this.

No national rule requires this document. It is a local validation requirement, and whether your council asks for it is read from that council's own published list.

The specimen is written for a conversion, not a new build, because that is where this document is hardest to get right: a material change of use engages a different list of Building Regulations requirements from new build, and a statement written to the new-build pattern will claim compliance with one requirement that does not apply and miss several that do.

Who signs it

Required when
The council's validation list requires one for new floorspace
Local policy sets energy or carbon standards above building regulations

Asked and answered

About the Sustainable Design Statement.

Is this the same as an energy statement?
It overlaps. Some councils ask for both under different names and some fold them together. The submission checklist reads your council's own list rather than assuming a national pattern.

Find out whether your site needs one.

The appraisal names the route, lists the documents that route requires, and prices the set before you commit to anything.

Draw your siteWhat a set costs